Switching
Switch installation and configuration: VLANs, uplinks, PoE and port settings
Cabling, racks, switches, Wi-Fi and internet links installed to the approved design, tested point by point and documented as built.
Switch installation and configuration: VLANs, uplinks, PoE and port settings
Access point mounting, controller or cloud setup, SSIDs for staff, guests and students
Router and firewall setup, multiple ISP links, failover, branch connectivity
Site-to-site VPN between offices and secure remote access for staff
DHCP, DNS and network printing configured for all segments
Schedule, site access, work hours and responsibilities agreed with your facility team.
Cables laid along approved routes, in conduits or trays, and terminated at both ends.
Racks fixed, patch panels and switches mounted, cables dressed and labelled.
Switches, access points, routers and firewall configured to the design.
Users moved to the new network, with the old network kept as fallback until sign-off.
Cable routes, drilling and false-ceiling work are agreed in advance with your facility team, and the existing network keeps running until the new network is tested and accepted.
Passive materials and active equipment are brand-neutral and specified in the design. Active equipment is as listed on Network consultancy and design.
Manufacturer warranty on switches, access points and routers, handled by Systune
New points, moves and configuration changes on request
Available under an annual maintenance contract
Share the building layout or approved design, number of points, Wi-Fi areas and timelines.